The Lowboy That Couldn’t Carry On
A heavy-haul trip depends on every section of the trailer doing its job. Near Throckmorton, a lowboy carrying a 150,000-pound windmill transmission suffered a serious frame failure, leaving part of the trailer on the ground. We were called to assist Action Wrecker with a Throckmorton heavy lift recovery along Highway 283, about four miles north of FM 2584.
The frame had broken roughly three-quarters of the way toward the rear. With the transmission still on top, the damaged trailer wasn’t going anywhere. It was all hands on deck.


The Original Plan Wasn’t Going to Work
The vehicle combination consisted of a four-axle tractor pulling a 13-axle lowboy trailer. The trucking company initially wanted us to remove a 10-foot bridge section from the damaged trailer and reset the transmission on the original lowboy.
We took a look at the damage, but the damage bent the trailer too badly to remove the bridge. There was no way to make the original plan work with the frame in that condition.
A replacement trailer would have to be brought in. First, though, we had to get 150,000 pounds of freight off the broken lowboy.
Four Rotators, Four Corners
We brought together four 50-ton Century rotators for the lift and hooked each to a corner of the windmill transmission, with three-part lines rigged to handle the weight.
The operation involved quite a few people:
- Five wrecker operators coordinating the lift.
- Four 50-ton Century rotators positioned around the load.
- Trucking company employees and a load manager assisting with the operation.
- Four TxDOT operators working at the scene.
With everything rigged, the operators began lifting simultaneously. All four corners had to rise together until there was enough clearance to pull the damaged lowboy out from underneath.
During this heavy-load recovery on Highway 283, the rotators held the transmission above the trailer while we moved the broken equipment. Once there was room, we lowered the freight onto the ground to wait for the replacement trailer.

Four Hours of Lifting, Several More of Waiting
The heavy lift near Throckmorton got the transmission off the damaged trailer. Without the enormous weight sitting on its broken frame, the original lowboy was able to limp back to the trucking company’s yard.
It still needed repairs, of course. The frame had suffered serious damage, and the trailer was no longer fit to carry the windmill transmission.
The hands-on portion of the Throckmorton lowboy recovery took approximately four hours. Getting four rotators into position, rigging the load, lifting it, and clearing the failed trailer was a substantial operation on its own.
Then came the wait.
The replacement trailer took several additional hours to arrive. While the transmission was safely on the ground, the crew had to account for the extra time needed to get suitable transportation to the scene.
This Highway 283 heavy recovery brought together CTR Incident Management, Action Wrecker, Crow Towing, and TxDOT. With four rotators lifting the same piece of freight, communication between the operators was essential. Everyone had to be ready to move together, and nobody could rush their part of the lift.

CTR Towing’s Heavy-Lift Recovery Services in North Texas
CTR Towing Service is a family-owned business. We built CTR on three generations of towing experience. Our founder grew up around the industry, and our Dallas-based team brings over 75 years of combined towing experience to the job. We’ve worked hard to keep the company rooted in the values we grew up with: reliability, integrity, and taking care of the people who depend on us.
For this heavy-duty recovery in Throckmorton, we joined forces to handle a load that no single rotator was able to lift alone. The original trailer couldn’t be repaired or adjusted at the scene to carry the transmission, so we changed the plan, lifted the freight clear, and made room for a replacement.
Frequently Asked Questions
What happened to the lowboy trailer near Throckmorton?
The trailer’s frame broke approximately three-quarters of the way toward the rear while carrying a 150,000-pound windmill transmission. The damaged section ended up on the ground.
Why was a replacement trailer needed?
The original trailer was too badly bent to remove its 10-foot bridge section and reset the load. It couldn’t continue hauling the transmission in that condition.
How was the transmission lifted off the broken trailer?
The operators used three-part line rigging and lifted simultaneously with all four rotators. Once the load was high enough, the damaged trailer was pulled out and the transmission was lowered to the ground.
How long did the recovery take?
The load transfer work took approximately four hours. Waiting for the replacement trailer added several more hours.
Who assisted with the heavy lift?
CTR Incident Management, Action Wrecker, Crow Towing, and TxDOT were involved. The scene included five wrecker operators, trucking company personnel, a load manager, and four TxDOT operators.